Limpid Markets
← Back to Intelligence

Caledonia Mining cuts 2026 gold production guidance, raises cost outlook - Engineering News

Engineering News via Google News Tier 3 2026-10-09 14:11 UTC 📖 1 min brief Bullish
Gold

AI desk brief

Caledonia Mining cut 2026 Blanket mine guidance to 69,000-72,500 oz from 72,000-76,500 oz after Q3 production disappointed at 17,030 oz vs 19,106 oz a year earlier. Full-year on-mine cost guidance was raised to $1,700-$1,900/oz sold and AISC to $2,650-$2,850/oz, underscoring higher unit costs from lower volumes.

The company now sees Q4 output at about 19,800-23,300 oz, helped by added compressor capacity, access to higher-grade areas, recovery of about 1,100 oz retained in the plant, and more ore from Lima. Caledonia also trimmed 2026 capex to $94.3m from $103.3m, mainly by deferring part of the 132 kV power line project to 2027, while saying internal cash flow should still support Bilboes funding.

Sources used

  1. S1 Engineering News via Google News — Caledonia Mining cuts 2026 gold production guidance, raises cost outlook - Engineering News
↗ Source Unavailable