Limpid Markets
← Back to Intelligence

Integra Resources Maps Path to 300,000 Ounces of Annual Gold Production - TradingView

TradingView via Google News Tier 3 2026-10-04 23:02 UTC 📖 1 min brief Neutral
Gold

AI desk brief

Integra Resources outlined a path to expand from 70,000-75,000 oz expected at Florida Canyon in 2026 to roughly 200,000 oz annually once DeLamar is online, and ultimately 250,000-300,000 oz/year with Nevada North added. The updated Florida Canyon technical report extends mine life to 2033 and implies average annual free cash flow of about $90 million over the next eight years, though 2026 costs are set to rise on pre-stripping, fleet replacement and pulled-forward heap-leach expansion work.

Integra said Florida Canyon AISC should trend to just over $2,300/oz over the life of mine, while drilling at the Central Radio Tower saddle returned intercepts including 0.84 g/t over 35 m and 0.83 g/t over 29 m. DeLamar has entered NEPA permitting and is targeting a Record of Decision in 2H next year; construction costs were pegged at about $390 million in the December feasibility study.

Sources used

  1. S1 TradingView via Google News — Integra Resources Maps Path to 300,000 Ounces of Annual Gold Production - TradingView
↗ Source Unavailable