Anglo Asian Mining lowers gold production forecast in Azerbaijan - Apa.az
Gold
AI desk brief
Anglo Asian Mining cut its 2026 gold production forecast to 26,000–30,000 oz from 28,000–33,000 oz after weaker-than-expected gold recovery at the Gilar deposit in H1. Copper and silver guidance were left unchanged, while copper AISC guidance was reduced to $6,000–$7,000/t from $6,800–$7,800/t; the company also said H1 copper output of 8,840 tonnes was a record half-year level.
Sources used
- S1 Apa.az via Google News — Anglo Asian Mining lowers gold production forecast in Azerbaijan - Apa.az